30kVA Diesel Generator (Perkins Diesel Engine+Stamfod/ Leroy Somer Alternator)

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-24 14:43

  • Browse the number:

    163

Send an inquiries
Company Profile
Fuzhou GFF Keypower Equipment Co. Ltd
Contactaixin:

gff-keypower(Ms.)  

telephone:

Arrea:

Beijing

Address:

Fu Wan Industrial Zone, Qi An Road, No. 760 2#1F, Cangshan District, Fuzhou, Fujian, China (350008)

Website:

http://gff-keypower.hongfutextile.com/

Product details

Model Number: KP-P30P-C086 Brand Name: KEYPOWER Key Specifications/Special Features: KEYPOWER diesel generator range and general specifications:Ratedoutput:2to2,000kW/2to2,500kVARatedvoltage:L-N110to277V,L-L220to480VRatedfrequency:50/60HzCoolingmethod:closedwater-cooledorair-cooledStartingmethod:electricstartorrecoilstartRated RPM:1,500/1,800/3,000/3,600rpmNoiselevel:56to75dB,7metersaway KEYPOWER GENERATOR FEATURES * Different brands of engine, alternator and controller as options * Open type, silent type or super silent type * CE, ISO9001-2008, ISO14001-2004, SONCAP, SASO certified *WithGermanVartamaintenance-freebattery *WithGermanPhoenixterminalblocks *With100%fire-resistant sound attenuatingsponge *0-110%loadtestforeachunitbeforedelivery GENSET TECHNICAL DATA Genset Model KP-P30P Prime Power(KW/KVA) 24/30 Standby Power(KW/KVA)
26.4/33 Rate Voltage 220/380V Power Factor 0.8~1.0 Engine Model 1103A-33G Alternator Model Stamford Pl144G Control System Deepsea Battery capacity 12V Frequency 50HZ Fuel Tank Capacity(L) 50 DIESEL ENGINE TECHNICAL DATA Number of Cylinders 3 Cylinder arrangement Vertical in-line Displacement (L) 3.3 Aspiration Naturally Aapiration Bore×Stroke (mm×mm) 105*127 Compression Ratio 19.25:1 Speed Governor Electronic Cooling System Water-cooled,50℃Radiator As Standard Fuel Consumption at 100% load(L/H) 8.1
Shipping Information:
  • FOB Port: Fuzhou
  • Lead Time: 20 - 45 days
Main Export Markets:
  • Mid East/Africa
  • Central/South America
  • Asia
  • Australasia
  • North America
  • Western Europe